Approved Document O: Part O Overheating Requirements

Sources: Approved Document O (overheating), 2021 edition

Check your set instantly
Quick answer

Part O limits overheating in new homes, care homes and student housing in England. Its simplified method caps glazing by location, orientation and cross-ventilation, and sets minimum openable areas. In a moderate-risk location, a south-facing flat without cross-ventilation may glaze 15% of its floor area. Otherwise, a CIBSE TM59 model shows compliance.

The Pirros Quality Management System can check the glazing of every room against its floor area in your set and Revit model, instantly.

The manual way

How to check the code requirements

Run the simplified method early, while the elevations can still change. It needs room and unit floor areas, glazing areas by façade, and the openable area of each window.

  • Place the site. Check the postcode against Appendix C. High risk is urban and some suburban London; the rest of England is moderate (para 1.3).
  • Classify each unit. Cross-ventilated means openings on opposite façades. Corner flats and single-aspect flats are not cross-ventilated (para 1.4).
  • Measure the glazing. Divide glazing area by floor area for the unit and for its most glazed room. Compare both with Table 1.1 or 1.2, using the orientation of the most glazed façade.
  • Measure the free area. Total the equivalent area of openable windows and vents, then check Table 1.3 or 1.4. Bedrooms have their own minimum.
  • Discount openings that can't be used. Windows on noisy façades, insecure ground-floor openings and unguarded windows don't count (paras 3.3, 3.6, 3.9). If the method then fails, model to TM59 (para 3.1).
  • Detail the guarding. Openings over 100 mm need guarding 1.1 m high where the drop outside is over 600 mm (Table 3.1). Below 600 mm, Approved Document K applies.

Openings for Part O usually exceed the purge ventilation that Approved Document F asks for, and the higher amount applies. Limiting glazing also cuts winter solar gains, which the Approved Document L calculation sees. It is best settled early in the RIBA stages, before the elevations are fixed. The document is free on gov.uk (Approved Document O). Glazing and openings sit on plans, elevations and window schedules, which is where an AI-powered quality management system reads them.

Plans of three flats in a moderate-risk location, with most glazing facing south: a dual-aspect flat, with openings on opposite façades, is cross-ventilated and may glaze 15% of its floor area and 30% of its most glazed room, with a free area of 9% of floor area or 55% of glazing, whichever is greater; a corner flat (adjacent façades) and a single-aspect flat are not cross-ventilated, with glazing limits of 15% and 15% and a free area of 12% of floor area or 80% of glazing; bedrooms have a free area of at least 4% of their floor area; openings over 100 millimetres count only with guarding 1.1 metres high where the drop outside is over 600 millimetres
Pirros Quality Management

How Pirros checks the set

The Pirros Quality Management System reviews projects against code requirements, firm standards, and project specifications, then assigns, tracks, and resolves issues before they become RFIs or rework.

  • Reads every sheet in your set against the codes you pick for the project: the Building Regulations and Approved Documents.
  • Every finding names the sheet, the location and the section behind it.
  • Findings are surfaced, never auto-applied. Your reviewer confirms, dismisses or escalates.

Requirements at a glance

Approved Document O: Part O Overheating Requirements, by section
ElementRequirementSection
Where it appliesNew residential buildings only: homes and flats, care homes and similar places where people sleep, and student accommodation. Rooms in hotels are excluded. Shared communal rooms and common spaces are in scope.Requirement O1 · Paras 0.3, 0.4
Requirement O1Limit unwanted solar gains in summer and provide an adequate means to remove heat. Account for occupant safety and reasonable enjoyment. Mechanical cooling only where heat cannot otherwise be removed.Requirement O1(1), O1(2)
Two ways to complyThe simplified method in Section 1, or dynamic thermal modelling to CIBSE TM59 within the limits of paragraph 2.6. A modelling report goes to Building Control.Paras 1.1, 2.3, 2.4
Risk locationHigh risk: urban and some suburban parts of London, listed by postcode in Appendix C. Moderate risk: the rest of England. Central Manchester postcodes M1, M2, M3, M5, M15, M16 and M50 may follow the high-risk guidance.Para 1.3 · Appendix C
Cross-ventilationOpenings on opposite façades. A corner flat, with openings on adjacent façades, doesn't qualify. Each unit, communal room and common space is categorised on its own.Para 1.4
Glazing limits, cross-ventilatedMaximum glazing as % of floor area, for the unit and its most glazed room, by the orientation of the most glazed façade. High risk: north 15 and 37, east 18 and 37, south 15 and 22, west 18 and 37. Moderate risk: north 18 and 37, east 18 and 37, south 15 and 30, west 11 and 22.Table 1.1 · Para 1.6
Glazing limits, not cross-ventilatedSame basis. High risk: north 15 and 26, east 11 and 18, south 11 and 11, west 11 and 18. Moderate risk: north 18 and 26, east 18 and 26, south 15 and 15, west 11 and 11.Table 1.2
Shading, high risk onlyGlazing facing between north-east and north-west, via south, needs shading. Options: external shutters with ventilation, or glazing with a g-value of 0.4 maximum and light transmittance of 0.7 minimum. On due-south façades, overhangs with a 50° cut-off also work.Para 1.9
Minimum free areaCross-ventilated: the greater of 6% of floor area or 70% of glazing area (high risk), or 9% or 55% (moderate). Not cross-ventilated: 10% or 95% (high), 12% or 80% (moderate). Bedrooms: 13% (high) or 4% (moderate) of their floor area.Table 1.3 · Table 1.4
Measuring free areaEquivalent area, measured to BS EN 13141-1 or calculated by Appendix D, meets or exceeds the free area.Para 1.12
When the simplified method is ruled outBuildings with more than one unit and communal heating or hot water with significant horizontal distribution pipework.Para 1.13
TM59 modelling limitsBy day, windows start to open above 22°C and are fully open above 26°C. At night (11pm to 8am), they are fully open only above 23°C at 11pm, on the first floor or higher and not easily accessible.Para 2.6
NoiseBedroom windows are likely closed at night (11pm to 7am) if noise inside exceeds either limit. The limits are 40 dB LAeq,T over 8 hours, or 55 dB LAFmax more than 10 times a night.Paras 3.2, 3.3
SecurityIn ground-floor and easily accessible bedrooms, only openings that can be opened securely count at night: fixed or lockable shutters, grilles or railings.Paras 3.6, 3.7
Protection from fallingOpenings wider than 100 mm count only with guarding 1.1 m high where the drop outside is over 600 mm. Guarding stops a 100 mm sphere. Outward-opening handles sit 650 mm maximum from the inside wall face.Para 3.9, Table 3.1
HandoverInformation on the overheating strategy goes to the owner within five days of completion.Regulation 40B

These numbers are from the 2021 edition, in force in England since 15 June 2022 and republished with corrections on 25 February 2022. Work notified before 15 June 2022 and started before 15 June 2023 is exempt. The gov.uk page lists no newer edition. Building Circular 01/2026, on the Future Homes and Buildings Standards, does not change Part O.

FAQ

Frequently asked questions.

Can't find what you're looking for?
Get in touch.

No. Requirement O1 covers dwellings, institutions and other buildings with rooms for residential purposes, other than a room in a hotel. It applies to new homes and flats, care homes and similar places where people sleep, and student accommodation (Table 0.1).

No. Part O applies only to new residential buildings, according to gov.uk's Approved Document O FAQs. It doesn't apply to extensions or conservatories added later, or to buildings undergoing a change of use. A conservatory built as part of a new home must comply.

Section 1's route to compliance without modelling. It caps glazing by risk location, orientation and cross-ventilation (Tables 1.1 and 1.2), and sets minimum free areas for openings (Tables 1.3 and 1.4). High-risk locations also need shading (para 1.9). Values in the tables can't be interpolated.

When the design fails the simplified method, or the method is ruled out. That includes buildings with communal heating and significant horizontal pipework (para 1.13), and sites where noise keeps bedroom windows shut at night (para 3.1). The model follows CIBSE TM59 within the limits in paragraph 2.6.

No. Bedroom windows are likely closed where noise inside would exceed 40 dB LAeq,T over 8 hours (para 3.3). The same applies above 55 dB LAFmax more than 10 times a night. The simplified method then cannot be met, so dynamic thermal modelling is used (para 3.1).

Not so far. The gov.uk page lists only the 2021 edition, republished with corrections in February 2022. Building Circular 01/2026, on the Future Homes and Buildings Standards, revises Approved Documents L and F only.

A design aid, not legal advice. Confirm requirements with Building Control.

Contains public sector information licensed under the Open Government Licence v3.0.

Talk to a product specialist about Pirros.

Set up a time with our team and see Pirros for yourself.

By submitting, you agree to our Privacy Policy and Terms of Service.