Building Regulations requirements
Requirements from the Approved Documents, each with its numbers and the paragraph they come from, checked against the Approved Document itself.
Fire safety
- Approved Document B: Fire SafetyApproved Document B is the approved guidance on the fire safety requirements of the Building Regulations in England. Volume 1 covers dwellings and blocks of flats; Volume 2 covers all other buildings. Both cover B1 to B5: warning and escape, linings, structure, external fire spread and fire service access. The current text is the 2019 edition, amended to 2026.
- Cavity Barriers: Where They Are Required and Maximum Cavity SizesApproved Document B needs cavity barriers at the edges of cavities, around openings and where a cavity wall meets a compartment floor or wall. In buildings other than dwellings, no cavity may run more than 20 m undivided, or 10 m with poorer surfaces. Barriers give 30 minutes' integrity and 15 minutes' insulation (E 30, I 15).
- Fire Compartmentation: Where Compartment Walls and Floors Are RequiredUnder Approved Document B, walls between buildings and between different uses are compartment walls. Every floor in blocks of flats is a compartment floor, except within a flat. Non-residential storeys stay within Table 8.1, such as 2,000 m² for an unsprinklered shop. Compartment walls run to the floor or roof above, with fire resistance from Tables B1 and B2.
- Fire Door Regulations: Where Fire Doors Are Required and Which RatingApproved Document B Table C1 sets each fire door's rating by position. Flat entrance doors and doors to protected stairways and lobbies are E 30 Sa (FD 30S). Other protected corridors and corridor sub-divisions are E 20 Sa. Most fire doorsets need a self-closer. In blocks over 11 m, communal fire doors are checked every 3 months.
- Regulation 7(2): Combustible Materials in External WallsRegulation 7(2) bans combustible materials in the external walls of relevant buildings. A relevant building has a storey at least 18 m above ground and contains dwellings, an institution or a room for residential purposes. Materials must be class A2-s1, d0 or A1, apart from those regulation 7(3) exempts. Regulation 7(1A) bans relevant metal composite material at any height.
Access and toilets
- Accessible Toilet Dimensions: Wheelchair-Accessible WC LayoutDisabled toilet dimensions in England come from Approved Document M: a wheelchair-accessible unisex toilet is at least 1500 × 2200 mm. The WC centreline sits 500 mm from the side wall, with the front of the pan 750 mm from the rear wall. Seat 480 mm, rails 680 mm. The building's only toilet is 2000 mm wide.
- Nationally Described Space Standard (NDSS): Minimum Dwelling and Room SizesThe Nationally Described Space Standard (NDSS) is a planning standard, not part of the Building Regulations. It applies where the local plan adopts it, and to permitted-development homes. It sets minimum floor areas by bedrooms, bedspaces and storeys, such as 50 m² for a one-bedroom, two-person flat. Bedrooms are 7.5 m² single and 11.5 m² double.
- Part M Building Regulations: Approved Document MPart M of the Building Regulations covers access to and use of buildings in England. Approved Document M Volume 1 sets three categories of new home: M4(1) by default, M4(2) or M4(3) where planning requires. Volume 2 covers other buildings: doors at least 800 mm clear, 1200 mm corridors, ramps up to 1:12 and 1500 × 2200 mm accessible toilets.
- Part T Building Regulations: Toilet Accommodation RequirementsPart T, explained in Approved Document T, has applied since 1 October 2024. Buildings other than dwellings need male and female single-sex toilets, or universal toilets where space precludes them. It sizes four types: A 985 × 2125 mm, B 1050 × 1685 mm, C 920 × 1465 mm and D 910 × 1740 mm.
Energy and ventilation
- Approved Document O: Part O Overheating RequirementsPart O limits overheating in new homes, care homes and student housing in England. Its simplified method caps glazing by location, orientation and cross-ventilation, and sets minimum openable areas. In a moderate-risk location, a south-facing flat without cross-ventilation may glaze 15% of its floor area. Otherwise, a CIBSE TM59 model shows compliance.
- Approved Document S (Part S): EV Charging RequirementsPart S requires electric vehicle charge points where new buildings in England have parking. New residential buildings need one per dwelling, or one per space if spaces are fewer. Beyond 10 spaces, and more spaces than dwellings, the rest get cable routes. New non-residential buildings with over 10 spaces need one charge point and cable routes in one in five.
- Part F Building Regulations: Ventilation RequirementsPart F requires adequate ventilation. In a new home, intermittent fans extract 30 l/s from a kitchen with a cooker hood, or 60 l/s without. Bathrooms need 15 l/s and WCs 6 l/s. Naturally ventilated homes need 8,000 mm² of trickle vents per habitable room. Purge openings are 1/20 of floor area.
- Part L Building Regulations: Approved Document LPart L of the Building Regulations sets energy efficiency standards in England. A new home must meet its SAP targets for primary energy, emissions and fabric efficiency. Limiting U-values are 0.26 for walls, 0.16 for roofs, 0.18 for floors and 1.6 W/(m²·K) for windows. Air permeability may not exceed 8.0 m³/(h·m²) at 50 Pa.
Structure and building fabric
- Approved Document C: Moisture, Radon and DPCsApproved Document C covers Part C: site preparation, contaminated land, radon and moisture. A wall’s damp-proof course (DPC) sits at least 150 mm above the adjoining ground, continuous with the floor membrane. Cavities run 225 mm below the lowest DPC, or a cavity tray drains them. Suspended timber floors need a ventilated void 150 mm deep.
- Approved Document E: Sound Insulation RequirementsApproved Document E sets the sound insulation targets for Part E in England. Separating walls between new homes need 45 dB DnT,w + Ctr; separating floors need 45 dB and at most 62 dB L’nT,w. Conversions need 43 dB, and 64 dB for impact. Internal walls around bedrooms need Rw 40 dB. Sites are tested, or built to Robust Details.
- Approved Document G (Part G): Sanitation and Water EfficiencyApproved Document G covers Part G: water supply, hot water safety, water efficiency and sanitation in England. Every WC needs a basin, and a door between it and any kitchen. Bath hot water is limited to 48°C. A new home's estimated use must stay within 125 litres per person per day, or 110 where planning requires it.
- Approved Document K (Part K): Stairs, Ramps and GuardingApproved Document K sets Part K's rules for stairs, ramps, guarding, glazing and doors in England. A private stair rises 220 mm at most, with a 220 mm minimum going and a 42° maximum pitch. Handrails sit 900 to 1,000 mm above the pitch line. Guarding is 900 mm on dwelling stairs and 1,100 mm at external balconies.
- Part A Building Regulations: Approved Document APart A of the Building Regulations covers structure: loading (A1), ground movement (A2) and disproportionate collapse (A3). Approved Document A sizes masonry for residential buildings up to three storeys without calculation. Cavity leaves are at least 90 mm, cavities 50 mm, and ties 900 by 450 mm apart. Lintels bear 150 mm; strip footings sit 0.45 m deep or more.
- Part H Building Regulations: Drainage and Waste DisposalPart H of the Building Regulations covers drainage and waste disposal in England, with guidance in Approved Document H. A foul drain carrying a WC is 100 mm minimum, laid no flatter than 1:80 where peak flow exceeds 1 l/s. Inspection chambers sit at most 45 m apart. Building within 3 m of a mapped sewer falls under H4.