Cavity Barriers: Where They Are Required and Maximum Cavity Sizes

Sources: Approved Document B (fire safety), Volumes 1 and 2, 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments (requirement B3(4))

Check your set instantly
Quick answer

Approved Document B needs cavity barriers at the edges of cavities, around openings and where a cavity wall meets a compartment floor or wall. In buildings other than dwellings, no cavity may run more than 20 m undivided, or 10 m with poorer surfaces. Barriers give 30 minutes' integrity and 15 minutes' insulation (E 30, I 15).

The Pirros Quality Management System can check every cavity barrier on your wall sections, external wall elevations and ceiling plans in your set and Revit model, instantly.

The manual way

How to check the code requirements

Cavity barriers are placed on the wall sections and checked on the elevations and ceiling plans. Find every concealed space first, then close its edges and divide it.

  • List the cavities. Wall cavities, ceiling and floor voids, roof spaces and rainscreen cavities all count: a cavity is any concealed space (9.1).
  • Close the edges. Put barriers around every window, door and service opening, and at the top and bottom of each cavity (9.3a, Diagram 9.1).
  • Stop at every compartment line. Where a cavity wall meets a compartment floor or wall, add a barrier on that line (9.3b, c). In a rainscreen, that means a barrier at each compartment floor.
  • Divide long cavities. In buildings other than dwellings, dimension each undivided run. Keep it to 20 m, or 10 m where the surfaces are worse than class C-s3, d2 (Table 9.1).
  • Check the masonry exemption. Two leaves of brick or concrete, each 75 mm or thicker, need only closers at the top and around openings (Diagram 9.2).
  • Specify each barrier. Note E 30 and I 15 on the section, or a 9.14 material such as 38 mm timber in a stud wall. Show how it is fixed (9.15).
  • Check what passes through. Only E 30 fire doorsets, pipes, cables, dampered openings and E 30 or dampered ducts may pass a barrier (9.17).

Cavity barriers belong on the wall section, dimensioned against the floors and walls they line up with. The rules are in Section 9 of Approved Document B Volume 2 and Sections 5 and 8 of Volume 1. On a drawing set they sit on wall sections, elevations and ceiling plans, which is where an AI-powered quality management system reads them.

Sections through an office's rainscreen wall and a masonry cavity wall: in the rainscreen, cavity barriers at the top and bottom of the cavity, around a window and on the compartment floor line, and a ceiling void divided by a barrier 20 m max from the wall, or 10 m where surfaces are worse than class C-s3, d2, each barrier E 30 and I 15 from each side; in the masonry wall, two leaves 75 mm min each, closed at the top and around the opening with closers only, no barriers
Pirros Quality Management

How Pirros checks the set

The Pirros Quality Management System reviews projects against code requirements, firm standards, and project specifications, then assigns, tracks, and resolves issues before they become RFIs or rework.

  • Reads every sheet in your set against the codes you pick for the project: the Building Regulations and Approved Documents.
  • Every finding names the sheet, the location and the section behind it.
  • Findings are surfaced, never auto-applied. Your reviewer confirms, dismisses or escalates.

Requirements at a glance

Cavity Barriers: Where They Are Required and Maximum Cavity Sizes, by section
ElementRequirementSection
Legal requirementThe unseen spread of fire and smoke within concealed spaces in the structure and fabric is inhibited. A cavity is any concealed space, and barriers divide cavities and close their edges.Requirement B3(4) · Vol 2 paras 9.1, 9.2
Where requiredAt cavity edges, including around windows, doors and service openings. Where an external cavity wall meets every compartment floor and wall. Where an internal cavity wall meets every compartment floor, compartment wall or fire-resisting wall or door assembly.Vol 2 para 9.3 · Vol 1 paras 5.18, 8.3
Masonry cavity wallsNo barriers under 9.3 where both leaves are brick or concrete, each 75 mm or thicker. Close the cavity around openings, and at the top unless it is fully filled with insulation. The closers need no fire resistance.Vol 2 Diagram 9.2 · Vol 1 Diagram 5.3
Not a compartment wallCavity barriers fitted above a line of compartment walls cannot complete it. The compartment wall runs to the underside of the floor or roof above.Vol 2 para 9.4 · Vol 1 paras 5.19, 8.4
Protected escape routesWhere the enclosure stops short of the floor or roof above, fit barriers on its line. Or, above it, an EI 30 ceiling throughout the building, compartment or separated part.Vol 2 para 9.5 · Vol 1 para 8.5
Maximum cavity sizeIn buildings other than dwellings: 20 m between a roof and a ceiling. Any other cavity: 20 m with exposed surfaces class C-s3, d2 or better, 10 m if worse.Vol 2 Table 9.1, para 9.9
Exceptions to Table 9.1Walls fire-resisting only because they are loadbearing; Diagram 9.2 walls; cavities above an EI 30 ceiling, up to 30 m. Also some cladding cavities on a 75 mm masonry or concrete inner leaf in non-residential buildings, and low or inaccessible underfloor voids.Vol 2 para 9.10
Large roomsA single room may exceed Table 9.1 with barriers only on its enclosing walls, 40 m apart at most. Its exposed surfaces must be class C-s3, d2 or better. Beyond 40 m, the 9.12 conditions apply.Vol 2 paras 9.11, 9.12
Houses and flatsThe same positions, performance, materials and openings rules, with no maximum cavity size. A house with a storey over 4.5 m needs barriers or an EI 30 ceiling above the protected stairway.Vol 1 paras 2.5, 5.16 to 5.24, 8.1 to 8.9
PerformanceE 30 integrity and I 15 insulation, tested from each side separately. A construction built for another purpose can serve if it performs the same.Vol 2 para 9.13 · Vol 1 para 5.20
Materials in stud walls and around openingsSteel 0.5 mm, timber 38 mm, compressed mineral wool, or calcium silicate, cement-based or gypsum-based boards 12 mm, all minimums. These may not reach E 30 and I 15.Vol 2 para 9.14 · Vol 1 para 5.21
FixingTight to rigid construction and mechanically fixed, or fire-stopped where that is not possible. Fixed to survive movement, collapsing services, failed fixings and failing abutting construction.Vol 2 paras 9.15, 9.16
Openings in a barrierOnly E 30 fire doorsets, pipes to Section 10, cables or conduits, openings with a fire damper, and ducts that are E 30 or fire-dampered.Vol 2 para 9.17 · Vol 1 para 5.24
External wallsCavity barriers follow Section 9. In residential buildings with a storey 11 m or more, insulation and filler materials in the wall are class A2-s1, d0 or better.Vol 2 paras 12.9, 12.7

These rules are from Approved Document B, 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments, for England. Volume 2's Table 9.1 limits apply to buildings other than dwellings; Volume 1 sets positions and performance but no maximum cavity size. In relevant buildings, with a storey 18 m or more above ground and a residential use, regulation 7(2) also governs external wall materials. Wales and Scotland set their own rules.

FAQ

Frequently asked questions.

Can't find what you're looking for?
Get in touch.

A construction that closes a concealed space, or divides it, to inhibit the hidden spread of smoke and flame (Approved Document B, Section 9). It gives at least 30 minutes' integrity and 15 minutes' insulation (E 30, I 15), tested from each side.

At the edges of cavities and around openings such as windows, doors and service entries. Also where an external cavity wall meets every compartment floor and wall (Vol 2 9.3). And where an internal cavity wall meets a compartment or fire-resisting element. Long cavities are divided too.

In buildings other than dwellings, 20 m in any direction (Vol 2 Table 9.1). That drops to 10 m where the exposed surfaces are worse than class C-s3, d2. A cavity between a roof and a ceiling can run 20 m whatever its surfaces. Volume 1 sets no maximum for houses and flats.

Not where both leaves are brick or concrete at least 75 mm thick (Diagram 9.2). The cavity is closed around openings, and at the top unless fully filled with insulation. Those closers need no fire resistance.

A cavity barrier closes or divides a concealed space (Section 9). Fire-stopping seals the joints, imperfect fits and service openings through a fire-separating element (Section 10). Approved Document B says the two should not be confused (9.2).

No. A line of compartment walls cannot be completed by fitting cavity barriers above them (Vol 2 9.4). The compartment wall runs to the underside of the floor or roof above.

A design aid, not legal advice. Confirm requirements with Building Control.

Contains public sector information licensed under the Open Government Licence v3.0.

Talk to a product specialist about Pirros.

Set up a time with our team and see Pirros for yourself.

By submitting, you agree to our Privacy Policy and Terms of Service.