Approved Document S (Part S): EV Charging Requirements

Sources: Approved Document S (infrastructure for charging electric vehicles), 2021 edition

Check your set instantly
Quick answer

Part S requires electric vehicle charge points where new buildings in England have parking. New residential buildings need one per dwelling, or one per space if spaces are fewer. Beyond 10 spaces, and more spaces than dwellings, the rest get cable routes. New non-residential buildings with over 10 spaces need one charge point and cable routes in one in five.

The Pirros Quality Management System can check the charge points and cable routes on every site and parking plan in your set and Revit model, instantly.

The manual way

How to check the code requirements

Part S is a count on the site and parking plan. Work out which spaces are associated parking, then place charge points and cable routes against the number of dwellings.

  • Mark the associated spaces. Count spaces within the site boundary for residents and visitors (Appendix A). Separate covered spaces from uncovered ones.
  • Count the charge points. One per dwelling, or one in every space where spaces are fewer than dwellings (requirement S1(2)). Put them in uncovered spaces first (regulation 44D(4)).
  • Add cable routes. With more than 10 spaces and more spaces than dwellings, every other space gets a cable route (S1(3)). In gov.uk's example, 10 flats with 12 spaces need 10 charge points and 2 cable routes.
  • Check the £3,600 cap. If quotes put the average connection cost above £3,600 per charge point, fit as many as the cap allows (paras 1.6, 1.7). The rest get cable routes.
  • Place each charge point. Put it where inlets in different places can reach, often at a bay corner (para 6.3). Give at least one accessible space a charge point or future connection location (para 6.4).
  • Label future connections. Each gets a 506 by 194 mm sign reading "Dedicated position for electric vehicle charge point" (para 6.11). Leave space for barriers where needed, for example 500 mm (para 6.12).

Accessible spaces are set by Approved Document M, car park fire safety by Approved Document B and vehicle barriers by Approved Document K. For comparison, see the US accessible parking rules. The document is free on gov.uk (Approved Document S). Charge points and cable routes sit on site and parking plans, which is where an AI-powered quality management system reads them.

Parking plans for a new block of 10 flats with 12 spaces, with 10 charge points, one per flat, and cable routes to the other 2 spaces, and for a new office with 11 spaces, with 1 charge point and cable routes in 1 in 5 of the remaining 10, so 2; in both, the accessible space has a charge point and the cable routes run from a supply point to future connection locations; charge points are 7 kW minimum with a universal socket, at a bay corner, and each future connection carries a 506 by 194 millimetre sign in 25 millimetre letters
Pirros Quality Management

How Pirros checks the set

The Pirros Quality Management System reviews projects against code requirements, firm standards, and project specifications, then assigns, tracks, and resolves issues before they become RFIs or rework.

  • Reads every sheet in your set against the codes you pick for the project: the Building Regulations and Approved Documents.
  • Every finding names the sheet, the location and the section behind it.
  • Findings are surfaced, never auto-applied. Your reviewer confirms, dismisses or escalates.

Requirements at a glance

Approved Document S (Part S): EV Charging Requirements, by section
ElementRequirementSection
Where it appliesNew residential and non-residential buildings, material changes of use that create dwellings, major renovations and mixed-use buildings. A major renovation renovates more than 25% of the surface area of the building envelope.Para 0.3 · Appendix A
Associated parking spaceAny space within the site boundary for the use of an occupant of, or visitor to, a dwelling in the building. Where there is no associated parking, no charge point is needed.Para 1.1 · Appendix A
New residential: charge pointsAs many spaces with a charge point as there are dwellings. Where there are fewer spaces than dwellings, every space gets one.Requirement S1(2) · Para 1.1
New residential: cable routesWhere there are more than 10 spaces and more spaces than dwellings, every space without a charge point gets a cable route.Requirement S1(3) · Para 1.3
The £3,600 capInstall as many charge points as an average connection cost of £3,600 or less each allows, and cable routes for the rest. At least two formal quotes, one from the distribution network operator, go to Building Control.Regulation 44D(2), (3) · Paras 1.5 to 1.7
Covered car parksCharge points go in uncovered spaces first. Spaces in a covered car park get cable routes instead. A garage or carport used by one dwelling is not a covered car park.Regulation 44D(4) · Para 1.2 · Appendix A
Change of use to dwellingsEach new dwelling with associated parking gets at least one charge point, where the work touches the car park or its electrics. If the supply is not enough, fit as many as it allows and cable routes for the rest. Listed buildings and conservation areas are exempt where compliance would unacceptably affect their significance.Requirement S2 · Paras 2.4, 2.7, 2.8
Residential major renovationApplies where more than 10 associated spaces remain and the work touches the car park or its electrics. Each dwelling gets a charge point and the other spaces get cable routes. Over 7% of the renovation cost, cable routes only; if those alone exceed 7%, nothing. Not where the main purpose is fire safety of the walls or roof.Requirement S3 · Paras 2.10, 2.13
New non-residential buildingsMore than 10 spaces: one charge point, and cable routes in at least one in five of the remaining spaces. So 11 spaces need one charge point and two cable routes. If every space is covered, cable routes in one in five and no charge point.Requirement S4 · Paras 3.1, 3.4
Non-residential major renovationThe same counts where more than 10 spaces remain and the work touches the car park or its electrics. The same 7% cost test applies.Requirement S5 · Paras 4.1 to 4.3
Mixed-use buildingsThe residential rules apply to the dwellings' parking and the non-residential rules to the rest. If in doubt, the residential rules apply.Requirement S6 · Para 5.3
The charge pointDesigned and installed to BS EN 61851, with a 7 kW minimum rated output and a universal (untethered) socket. It has a charging status indicator and is at least Mode 3 on a dedicated circuit, to BS 7671.Regulation 44J · Para 6.2
Cable routesFrom a metered supply point with space for a new connection, such as a consumer unit or feeder pillar, to the future connection location. Containment such as ducts with draw ropes, trunking, conduit or trays lets cabling go in later without builders' work.Paras 6.7, 6.9, 6.10
Location and labellingCharge points suit inlets in different places, often at a bay corner. At least one accessible space gets a charge point or future connection location. Each future connection location carries a 506 by 194 mm sign in 25 mm letters.Paras 6.3, 6.4, 6.11

These numbers are from the 2021 edition, republished with corrections on 25 February 2022. Part S has applied in England since 15 June 2022. Work under a notice or plans submitted earlier is exempt if it started before 15 June 2023. Building Circular 01/2026, on the Future Homes and Buildings Standards, does not change Part S.

FAQ

Frequently asked questions.

Can't find what you're looking for?
Get in touch.

On 15 June 2022, in England. It does not apply to work under a notice or plans submitted earlier, provided work started on site before 15 June 2023.

Every new house with an associated parking space does. In gov.uk's example, a detached house with 2 spaces needs 1 charge point. It needs no cable routes, because it has 10 spaces or fewer. A house with no associated parking needs no charge point.

One per flat, or one per space if there are fewer spaces than flats (requirement S1). With more than 10 spaces and more spaces than flats, the rest get cable routes. In gov.uk's example, 10 flats with 12 uncovered spaces need 10 charge points and 2 cable routes.

Fit as many charge points as keep the average connection cost at £3,600 or less (regulation 44D). The rest get cable routes. In gov.uk's example, 30 houses averaging £4,000 get 20 charge points, bringing the average to £3,500. The other 10 get cable routes.

With more than 10 parking spaces, it needs one charge point (requirement S4, para 3.1). At least one in five of the remaining spaces get cable routes. With 11 spaces, that is one charge point and two cable routes. With 10 or fewer, Part S asks for nothing.

At least 7 kW, with a universal untethered socket and a charging status indicator. It is designed and installed to BS EN 61851, at least Mode 3 on a dedicated circuit, and meets BS 7671 (para 6.2). A tethered unit is acceptable only in exceptional cases, such as a self-build.

A design aid, not legal advice. Confirm requirements with Building Control.

Contains public sector information licensed under the Open Government Licence v3.0.

Talk to a product specialist about Pirros.

Set up a time with our team and see Pirros for yourself.

By submitting, you agree to our Privacy Policy and Terms of Service.